Dan Gallagher, Operations Manager for Dublin-San Ramon Services District, discusses the amount of electrical power the regional wastewater treatment plant in Pleasanton consumes and the steps taken to reduce the load on the statewide electrical grid, including the use of fuel cells, digester gas, and a cogeneration engine, and their level of effectiveness. He also touches on DSRSD's use of solar energy and the possibility of generating wind power. Contact Dan at 925-875-2345 or Gallagher@dsrsd.com, www.dsrsd.com. First aired on 2/5/09. Time 28:30.
<< Return to the Video on Demand page